Monday, 11 August 2008

Finished insulating overhead 4" Heating pipes that heat up the room where all the DSLAMs are situated. Equipment running in very high temperatures are more likely to fail.

Hopefully this will eliminate the need to build partitions to section of a part of the room and air condition it.